§ 3-2. Building division administrative and user fees.
Building division administrative and user fees shall be as follows:
(A)
Expired permit fees:
(1)
Renewal-expired permits—All disciplines:
a.
Fifty per cent (50%) of original master permit fee, minimum ..... $100.00
(B)
Miscellaneous fees:
(1)
All construction will include educational and training fees (per thousand of estimated cost) ..... 0.21
(2)
Electronic water meters, per building ..... 57.00
(3)
Retrofit of burglar alarms, per building ..... 55.00
(4)
Certificate of occupancy:
a.
Standard ..... N/C
b.
Temporary, per residential units, per unit per 30 days ..... 62.25
c.
Temporary, partial or stocking for commercial and other non-residential buildings (for each 30-day period) ..... 230.00
(5)
Permit card replacement—All disciplines ..... 18.50
(6)
Temporary construction-related structure ..... 62.25
(7)
Public art fees:
a.
New building construction or redevelopment:
1.
Public art fund contribution, per square foot of gross floor area ..... 0.50
2.
On site artwork, per square foot of gross floor area ..... 0.64
b.
Remodeling or converting:
1.
Public art fund contribution, per square foot of gross floor area being remodeled ..... 0.25
2.
Onsite artwork, per square foot of gross floor area being remodeled ..... 0.32
(8)
Temporary use permit ..... 62.25
(C)
Building permit fees:
(1)
New construction—Residential:
a.
Structural—Per cent of total construction value ..... 0.90%
b.
Electrical—Per cent of total construction value ..... 0.32%
c.
Plumbing—Per cent of total construction value ..... 0.15%
d.
Mechanical—Per cent of total construction value ..... 0.14%
(2)
New construction—Commercial:
a.
Structural—Per cent of total construction value ..... 0.64%
b.
Electrical—Per cent of total construction value ..... 0.36%
c.
Plumbing—Per cent of total construction value ..... 0.09%
d.
Mechanical—Per cent of total construction value ..... 0.06%
(3)
Residential additions:
a.
Structural—Per cent of total construction value ..... 2.9%
b.
Electrical—Per cent of total construction value ..... 0.83%
c.
Plumbing—Per cent of total construction value ..... 1.24%
d.
Mechanical—Per cent of total construction value ..... 0.62%
(4)
Residential alterations:
a.
Structural—Per cent of total construction value, unless otherwise provided below, in subsections (1) and (2) ..... 3.0%
(1)
The value of countertops shall be deducted from the total construction value.
(2)
The value of cabinet replacement only will be a minimum of $170.00 or two per cent of total construction value, whichever is greater shall be charged herein.
b.
Electrical—Per cent of total construction value ..... 0.9%
c.
Plumbing—Per cent of total construction value ..... 1.14%
d.
Mechanical—Per cent of total construction value ..... 1.14%
(5)
Commercial alterations/additions/tenant improvements:
a.
Structural—Per cent of total construction value ..... 1.97%
b.
Electrical:
Up to $120,000.00—Per cent of total construction value ..... 1.8%
Over $120,000.00—Per inspection ..... 55.00
Per hour plan review fee ..... 103.00
c.
Plumbing:
Up to $120,000.00—Per cent of total construction value ..... 1.3%
Over $120,000.00—Per inspection ..... 55.00
Per hour plan review fee ..... 103.00
d.
Mechanical:
Up to $120,000.00—Per cent of total construction value ..... 0.80%
Over $120,000.00—Per inspection ..... 55.00
Per hour plan review fee ..... 103.00
(6)
Reinspection—All disciplines (each reinspection) ..... 50.25
Upon fifth and subsequent disapprovals, and without a certified supervisor or representative at the job site at time of inspection, the applicable fee shall be doubled. "Certified," for the purposes of this ordinance, shall include the following:
a.
The qualifier (person authorized by state and county authorities to apply for and receive a building permit); or
b.
A representative for the contractor that has a recognized master (or Class "A" certified) or journeyman status in the appropriate trade; or
c.
A representative for the contractor that has a State of Florida license in architecture or engineering and has sufficient education and knowledge in the appropriate field.
(7)
Lost plan review (replacement of on-site plans) (sfr, multi, commercial, covers all disciplines) ..... 76.75
(8)
Plan resubmittal fee (for 3rd and subsequent resubmittals) ..... 50.25
(9)
Open permit request, per request ..... 31.75
(10)
Change in contractor and/or subcontractor—All disciplines ..... 38.25
(11)
Contractor overtime request—Plan review per hour, minimum ..... 88.00
(12)
Expedited plan review, per hour, per trade (one-hour minimum) ..... 88.00
(D)
Structural permit fees:
(1)
Administrative fees ..... 57.00
(2)
Awning (each) ..... 79.75
Base fee; plus, per awning ..... 26.00
(3)
Deck (wood) ..... 165.00
(4)
Demolition/blasting ..... 94.25
(5)
Fence—Base fee ..... 57.00
Plus, per lineal foot ..... 0.25
(6)
Landscape affidavit ..... 38.25
(7)
Garage door ..... 62.25
(8)
Gutters ..... 62.25
(9)
House moving filing fee within the City of Coral Springs ..... 254.25
(10)
Hurricane shutters (sfr, duplex, triplex - each multi-family, commercial, per floor):
a.
1—3 shutters ..... 62.25
b.
Each additional shutter ..... 5.25
(11)
Major plan revision (work not to exceed one hour) ..... 106.75
(12)
Masonry wall—Base fee ..... 62.25
Plus, per lineal foot ..... 0.44
(13)
Minimum fee (one inspection) ..... 57.00
(14)
Minor plan revision (corrections, lost plans, work not to exceed 15 minutes) ..... 39.25
(15)
Pool/spa/hot tub ..... 146.25
(16)
Roofs/reroofs:
a.
Flat re-roof ..... 123.25
b.
Flat re-roof (commercial):
1.
First 50 squares ..... 123.25
2.
Each additional 50 squares ..... 57.00
c.
Re-roof slope ..... 154.50
d.
Roof repair (two squares and under) ..... 57.00
e.
Roof slope and flat ..... 280.00
(17)
Satellite dish (over 18" requires separate electric permit) ..... 81.75
(18)
Screen enclosure ..... 106.75
(19)
Signs (unlighted, permanent or temporary) ..... 81.75
(20)
Slab (porch, patio, monolithic) ..... 88.00
(21)
Tent (any size, each) ..... 57.00
(22)
Trailer (construction, storage, each) ..... 151.50
(23)
Window/door replacement, plus $5.25 per unit ..... 57.00
(24)
Demolition ..... 94.25
(25)
Per hour plan review fee (a minimum of one hour) ..... 85.00
(E)
Electrical permit fees:
(1)
A/C change out ..... 93.25
(2)
Meter can ..... 57.00
(3)
Burglar alarm, new and retrofit (per floor up to six units) with each additional unit at a cost of $5.25 each ..... 55.00
(4)
Commercial site lighting:
a.
1—3 light standards ..... 57.00
b.
Each additional light standard ..... 13.00
(5)
Computer systems (commercial, per floor) ..... 117.25
Computer systems pre-wire (per floor) ..... 57.00
(6)
Electric sign (each) ..... 93.25
(7)
Electronic water meters, per unit ..... 7.50
(8)
Energy management system ..... 57.00
(9)
Fire alarm (sfr, duplex, triplex - each multi-family, commercial, per floor) ..... 142.00
(10)
Heat pump ..... 108.75
(11)
Low voltage—Individual systems per system (minimum fees):
a.
Sprinkler time clock, new installations only:
1.
1—3 time clocks ..... 57.00
2.
Each additional time clock ..... 7.50
(12)
Major plan revision (work not to exceed one hour) ..... 106.75
(13)
Minimum fee (one inspection) ..... 57.00
(14)
Minor plan revision (corrections, lost plan, work not to exceed 15 minutes) ..... 39.25
(15)
Pool/spa/hot tub/fountain ..... 170.00
(16)
Pool alarm system ..... 57.00
(17)
Radon mitigation (per unit) ..... 57.00
(18)
Satellite dish (requires separate structural permit) ..... 99.50
(19)
Service change:
a.
Residential ..... 92.25
b.
Commercial ..... 117.25
(20)
Sprinkler pump, heat pump ..... 106.75
(21)
Temporary electric ..... 76.75
30-day temporary electric ..... 49.25
(22)
Trailer (construction, sales, etc. each) ..... 96.50
(23)
Demolition ..... 94.25
(24)
Per hour plan review fee (a minimum of one hour) ..... 85.00
(F)
Plumbing permit fees:
(1)
Backflow preventer (new installation only), min. fee ..... 81.75
(2)
Electronic water meters, per unit ..... 6.25
(3)
Fire sprinkler system ..... 194.00
(4)
Gas pool heater ..... 63.25
(5)
LP gas system (one tank, one meter, two outlets) ..... 63.25
(6)
LP gas tank(s) ..... 63.25
(7)
Major plan revision (work not to exceed one hour) ..... 106.75
(8)
Minimum fee (one inspection) ..... 57.00
(9)
Minor plan revision (corrections, lost plans, work not to exceed 15 minutes) ..... 39.25
(10)
Sewer hook-up ..... 63.25
(11)
Site work, drainage, water mains, fire mains, sewer mains—Per cent of contract price ..... 2%
(12)
Solar pool heater/water heater ..... 81.75
(13)
Water heater (domestic water) ..... 63.25
(14)
Water well 2"—4½" ..... 63.25
(15)
Demolition ..... 94.25
(16)
Per hour plan review fee (a minimum of one hour) ..... 85.00
(G)
Mechanical permit fees:
(1)
A/C change out ..... 94.25
(2)
Gas, pool heater ..... 63.25
(3)
LP gas system (one tank, one meter, two outlets) ..... 63.25
(4)
LP gas tank(s) ..... 63.25
(5)
Major plan revision (work not to exceed one hour) ..... 106.75
(6)
Minimum permit (one inspection) ..... 57.00
(7)
Minor plan revision (correction, lost plans, work not to exceed 15 minutes) ..... 39.25
(8)
Radon mitigation ..... 63.25
(9)
Demolition ..... 94.25
(10)
Per hour plan review fee (a minimum of one hour) ..... 85.00
In addition to the fees above, the applicant should review the requirements of chapter 5 of the Code of Ordinances and any other applicable codes.
(Ord. No. 2004-121, § 2, 9-7-04; Ord. No. 2008-116, § 3, 9-16-08; Ord. No. 2009-111, § 3, 12-1-09; Ord. No. 2011-120, § 2, 9-20-11; Ord. No. 2012-105, § 3, 5-15-12; Ord. No. 2013-113, § 2, 9-4-13; Ord. No. 2014-127, § 2, 1-7-15; Ord. No. 2015-115, § 2, 9-2-15; Ord. No. 2017-109, § 2, 9-6-17)